Electrical Cable Installation LV &MV Cables
-
We specialize in all LV & MV electrical cable installation and civil works for LV cables & MV cables. These works include:
- Excavation
- Cable laying
- Cable pulling
- Cable termination
- Cable separation
- Cable testing
- Backfilling to required standards
- We have a professional and experienced cable pulling team with a complete set of tools up to 33KV. We ensure timely cable installation in difficult places, including trenches, ducts, or any cable tray system.
- Control & Relay Panels (132 & 33 KV).
- Substation Control and Monitoring System, SCADA Panels.
- Local Control Cubicles for Switchgear (LCC Panels).
Cable Laying,Termination,Splicing and Testing upto 33KV
LV & MV CABLE Laying,Termination, Splicing, and Testing
- Project Management
- Consultation
- Technical Documentation
- Engineering
- Supply, installation, testing, and commissioning of electrical equipment
- Supply & Installation of LV & MV Electrical Cable up to 33KV
- Termination, splicing, and testing of Low Voltage Cables & Medium Voltage Cables
- Onsite modification in Low Voltage Cables and Medium Voltage Cables switchgear, MCC, and panel boards
- Short circuit and relay coordination studies (ETAP)
- Complete retrofit of LV and MV MCCs
- Termination and jointing of cables up to 33KV
-
Testing of MV cables, including:
- IR Test
- Hi-pot Test
- Sheath Test
Substation Electrical Equipment Installation
Transformers, Gas Insulated Switchgears upto 220kv
We provide the following types of power equipment installation and distribution.
- Gas Insulated Switchgear up to 220KV
- Power Transformers up 800MVA
- Shunt Reactor 132KV 30MVA
- MV Switchgears,LV Switchgears
- Distribution, Auxiliary and Earting Transformers
- Control & Relay Panels
- Battery systems
- Substation control system.
- PDMS Systems
- Overall Substation Earthing System.
- Termination and jointing of cables up to 33 KV
- Testing of MV cables (IR Test, Hi-pot Test, Sheath Test, etc.)